Energy Ministry: BelNPP will boost Belarus' energy security

10:40, 6 October

photo: BelTA

Pavel Shkurko, head of the energy and gas supply office of the production and technology department of the Energy Ministry, shared the latest news about the Belarusian nuclear power plant with BelTA.

Pavel Shkurko noted that the first unit of the Belarusian nuclear power plant is already up and running, while the second unit is now at the pilot operation stage.

“Working in the base-load operation mode the two units will be able to generate 18.5 billion kWh of electricity and replace 4.5 billion cubic meters of gas. This will increase the country's energy security by diversifying its energy sources. Nuclear energy is already a reality in Belarus,” the specialist noted.

Other materials of «Society»

Belarus President’s team play second draw in RHL

15:23, 14 February

The premiere of the film "Dusha zaschitnika" took place in Minsk

10:09, 13 February

"Russians are lining up for our products." How Belarusian anticancer drugs are conquering the Russian market

16:40, 10 February

An exhibition supported by the Embassy of the Republic of Belarus in the Russian Federation opened at VDNKh in Moscow

11:02, 10 February